28 March 2018 avs

TERNA 2018-2022 STRATEGIC PLAN

GRIDS AND VALUES – Powering a sustainable growth
On 22th of March 2018 the Terna Group, first grid European operator in electricity transmission, has chosen the Cavallerizze, former stables of a military barracks, now refurbished structures included in the complex of the Museum of Science and Technology Leonardo Da Vinci di Via Olona in Milan, to present the 2018-2022 Strategic Plan and the results achieved in 2017.
For the occasion, AVS Group has supported the Agency Micromegas Comunicazione for the technical set-up of the meeting.
In particular, for the plenary room it has installed a 30 square meters LED screen with a pixel pitch of 2.5 mm, a lighting system for fill and backlighting, sound system for about 250 people, presidential teleprompter system, simultaneous translation eng- ita, four camera video switchboard, monitors of various sizes and microphones for the podium and for the speakers table. For the press room has been installed a 15 square meters LED screen with a 3.75 mm pixel pitch, audio system and video recording system with camera on a tripod. Everything was managed by an audio-video and lights direction desk of 14 meters lenght.